Drinking Water Supply (AEP)
- Year: 2020 – 2022
- Status: Delivered
- Contract: Public Tender (EPC)
Project Summary Sheet
- Client & Beneficiary
- Chad's Ministry of Water & Moundou community
- Scope of Intervention
- Drilling, treatment, supply and distribution
- Capacity / Output
- 15,000 m³/day
- Integrated Technology
- Hybrid thermal-solar pumping, potabilization plant
- Institutional Partners
- World Bank, Ministry of Water
- Execution Timeline
- 24 months, delivered on schedule
OVERVIEW
Durably supplying Moundou's population
The Moundou Drinking Water Supply (AEP) project covers the entire hydraulic value chain: from deep geological drilling to final distribution to local households and industries, including treatment and potabilization.
ENERSO developed integrated water supply and sanitation projects, relying on hybrid pumping technologies to ensure continuous flow while minimizing operating costs in this decentralized territory.
Active water supply stationTECHNICAL & LOGISTICAL CHALLENGES
Water stress and treatment quality
Seasonal water stress
Deep boreholes reaching resilient confined aquifers to overcome seasonal variations in water resources.
Treatment quality
Establishment of a potabilization plant compliant with international drinking water quality guidelines.
THE ENERSO RESPONSE
A complete and durable water infrastructure
ENERSO deployed high-performance hybrid (thermal-solar) pumping technologies, ensuring continuous flow while minimizing the carbon footprint and operating costs, from abstraction to final distribution to households and industries.
IMPACT & RESULTS
Durably secured access to drinking water
15,000 m³
Daily Production
Volume of drinking water produced and distributed daily since commissioning.
25,000+
Households Served
Households now having access to drinking water via the AEP network.
97%
Network Availability
Distribution network availability rate measured since commissioning.
12
Boreholes Drilled
Number of deep boreholes drilled to supply the distribution network.
SITE & OPERATIONS GALLERY


RELATED REFERENCE PROJECTS

20 MW IPP Plant
N'Djamena, Chad
Capacity / Output
20 MW

Moundou Hybrid Solar Plant
Moundou, Chad
Capacity / Output
5 MWp solar / 4 MWh battery

454-Locality Electrification
Southern Region, Chad & Border Areas
Capacity / Output
454 localities connected