NetworksSouthern Region, Chad & Border Areas

454-Locality Electrification

  • Year: 2021 – 2024
  • Status: MV/LV Deployment
  • Contract: Public Tender (EPC)

Project Summary Sheet

Client & Beneficiary
Chad's Ministry of Energy & local communities
Scope of Intervention
Study, construction and connection of MV/LV networks
Capacity / Output
454 localities connected
Integrated Technology
MV/LV lines, transformer substations, smart metering
Institutional Partners
World Bank, ARSE
Execution Timeline
36 months, phased regional rollout

OVERVIEW

Connecting rural territories in the South

The 454-locality electrification program deploys medium-voltage transmission lines and low-voltage distribution networks to rural areas previously without electricity access, across southern Chad and border zones.

ENERSO led the entire project, from impact assessment and preliminary engineering to the construction of transformer substations and regional power lines, working closely with local authorities.

454-Locality ElectrificationGrid team on deployment

TECHNICAL & LOGISTICAL CHALLENGES

Rural reach and material logistics

  • Reaching isolated rural areas

    Planning optimized low-voltage line routes to connect hard-to-reach localities without disproportionate cost.

  • Electrical equipment logistics

    Secure delivery of poles, cables and transformers to hard-to-access border areas.

THE ENERSO RESPONSE

A phased rollout coordinated with communities

ENERSO structured the program into successive regional phases, combining medium-voltage lines for interconnection with low-voltage networks for final distribution, with a smart metering system to optimize commercial grid management from commissioning.

IMPACT & RESULTS

A direct impact on electricity access

454+

Localities Connected

Number of localities connected to the national grid since the program launched.

40,000+

Households Connected

Households gaining direct electricity access for the first time.

97%

Network Availability

Reliability rate measured on segments already commissioned.

320 km

Line Kilometers

Cumulative length of medium- and low-voltage lines built.

SITE & OPERATIONS GALLERY