
Sarh Water Reservoir
- Year: 2022
- Status: Delivered
- Contract: Public Tender (Civil Works)
Project Summary Sheet
- Client & Beneficiary
- Chad's Ministry of Water & Sarh municipality
- Scope of Intervention
- Geotechnical study, structural works and handover
- Capacity / Output
- 5,000 m³
- Integrated Technology
- C30/37 reinforced concrete, special foundations
- Institutional Partners
- Ministry of Water, regional authorities
- Execution Timeline
- 10 months, delivered on schedule
OVERVIEW
Securing water distribution for the Sarh region
The Sarh water reservoir is a heavy reinforced-concrete civil engineering structure, designed to secure the region's drinking water distribution against seasonal consumption peaks.
ENERSO delivered this structure in full synergy with its Hydraulics division, combining local geotechnical expertise with international construction standards to guarantee robustness and durability.
ENERSO superstructuresTECHNICAL & LOGISTICAL CHALLENGES
Soil conditions and site access
Local geotechnical conditions
In-depth soil study to adapt special foundations to the characteristics of Sahelian terrain.
Site access
Development of temporary access roads for delivering heavy construction materials.
THE ENERSO RESPONSE
A robust and durable civil engineering structure
ENERSO mobilized its civil engineering teams to deliver a reinforced-concrete reservoir sized to the strictest international standards, guaranteeing decades of durability against Sahelian climate conditions.
IMPACT & RESULTS
Durable infrastructure for the region
1,800 m³
Concrete Volume Poured
Total volume of reinforced concrete used for the reservoir structure.
85%
Local Workforce
Share of site staff recruited locally in Sarh.
300+
Days Without Incident
Consecutive site days without a safety incident.
1
Structure Delivered
Reservoir delivered and accepted in line with technical specifications.
SITE & OPERATIONS GALLERY


RELATED REFERENCE PROJECTS

20 MW IPP Plant
N'Djamena, Chad
Capacity / Output
20 MW

Moundou Hybrid Solar Plant
Moundou, Chad
Capacity / Output
5 MWp solar / 4 MWh battery

454-Locality Electrification
Southern Region, Chad & Border Areas
Capacity / Output
454 localities connected
TALK TO AN EXPERT
Let's deploy your next infrastructure project together
Contact our technical and financial experts to structure your project and secure your assets.
Discuss your project